| Question | |
| Addenda |
| |
| Advertisements |
| |
| Attachment |
| |
| Bid Package |
| |
| Bid Results |
| |
| Bid Tabs |
| |
| Bonds |
| |
| Business Partner Registration |
| |
| Consultant Inspection |
| |
| Are design contracts under this same level of scrutiny? What is their process for... | |
| Can a higher pay grade be substituted for a lower pay grade without prejudice? (TCM-1 for a TCIS-2) | |
| Can an inspector be approved for assignment to multiple agreements at the same time? We understand... | |
| Can consultants simply summarize historic experience on the resume template for old projects if... | |
| Can or should there be a standard letter requesting relief? | |
| Can PennDOT Districts and associated IIC be strongly encouraged to use TA's? | |
| Can relief be granted for the entire agreement or does it have to be for each individual when the... | |
| Can resumes only indicate a break in service longer than a month? | |
| Can we submit rate approvals for an entire agreement, rather than by part or by work order? | |
| Can "TA" classification be added to advertisements? | |
| Can "TA" classification be staffed on a project regardless of classification being in the | |
| Do Municipal Projects fall under “Process Control”? | |
| Do substitutions apply to the alternates listed in an SOI? | |
| Do the experience and certification substitutions that are associated with P.E. License, CE... | |
| Does a consultant attain any relief on substitutes when the Dept. hires a consultant employee... | |
| Does a consultant have to constantly submit new resumes when a cert changes or can the consultant... | |
| Does a Letter of Interest not selected come under Process Control? | |
| Does a substitute for a substitute have to meet the requirements of the original or substitute? | |
| Does PennDOT recognize NICET Engineering Technologist Certification to cover NICET level 2, 3, or | |
| Does Process control apply to TAs? | |
| Does the subconsultant’s wage rate request go through the prime in ECMS II workflow? | |
| How are issues of Districts doing things differently to be addressed? | |
| How are prime consultants to know if a subconsultant is suspended or under sanctions? | |
| How is an inspector’s wage rate determined within the wage range? | |
| How long does PENNDOT have to approve a wage rate? | |
| If a consultant has to provide an inspector for a short-term assignment (to cover for an inspector... | |
| If a consultant is unable to provide a “substitute” inspector (equal or exceed qualifications of... | |
| If all personnel in SOI are utilized on the project and PennDOT requests additional staffing, what... | |
| If an inspector is requested long after the start of the project, does that inspector have to equal... | |
| If the Dept. elects to lay-off inspectors, what is the obligation of a consultant in supplying... | |
| If the Dept. tells a consultant that no staff is required or none of that title will be used and... | |
| Is it necessary to denote if the employee has a relative(s) who work for PennDOT? | |
| Most statements in the ECMS-FAQ's or the Process Control language itself refer the NTP date or some... | |
| Must we list past employers on the resume, or is PennDOT looking for the District on a PennDOT... | |
| Must we use the word "continuous" on projects where no breaks greater than two weeks occurred over... | |
| Some Districts are not including specific start dates for 2008 projects. How should we handle those... | |
| What are the criteria for providing substitute inspectors? | |
| What happens when an inspector's certification(s) expire during a project. | |
| What is included in Process Control for Construction Inspection? | |
| What is PennDOT to do in case of deficient or substandard submissions on the part of a sub... | |
| What is the definition of “relief” on page 3 of 4, 2a – second paragraph of Proposed Process... | |
| What is the obligation of a prime in reviewing the resumes and certifications of a sub? | |
| When submitting for the annual hourly rate increases, for example, on July 1, 2008, do we have to... | |
| Who determines which people to put on job (select these 4 out of 8) | |
| Who is allowed to execute a wage rate letter? | |
| Why is the prime consultant responsible if a subconsultant’s certification runs out during a... | |
| Will consultants still be subject to refunding money to the Department? | |
| With regards to substituting using equal or higher pay grade, must it be within the same pay grade... | |
| With the certification expiration date extension letter dated 12/21/07, what date should be listed... | |
| Consultant Qualifications |
| |
| Consultant Qualifications Package |
| |
| Contractor Prequalification |
| |
| Design Build Bid Preparation |
| |
| Design Build Bridge |
| |
| Design Build Environmental |
| |
| Design Build Inspection |
| |
| Design Build Preliminary Engineering |
| |
| Design Build Project |
| |
| Design Build Project Execution |
| |
| Design Build Review |
| |
| Design Build Right-of-Way |
| |
| Design Build Team |
| |
| Employee Roster |
| |
| General |
| |
| General Problems/Troubleshooting |
| |
| Help Desk |
| |
| IDM Viewer |
| |
| List of Contractors |
| |
| MBE and WBE |
| |
| Miscellaneous |
| |
| Price Proposal |
| |
| Project Questions |
| |
| Signature Authority |
| |
| Statements of Interest |
| |
| Technical Proposal |
| |