Consultant Inspection Question:
If an inspector is requested long after the start of the project, does that inspector have to equal or exceed the qualifications of the staff proposed in the SOI?

Answer:
If an inspector is requested within 2 weeks from the anticipated start dates identified in the RFP, then they must have to equal or exceed the qualifications of the staff proposed in the SOI.