Frequently Asked Questions
Total Records: 191
Quick Find:
 
Lines Displayed:
 
Question
Addenda
Advertisements
Attachment
Bid Package
Bid Results
Bid Tabs
Bonds
Business Partner Registration
Consultant Inspection
Consultant Qualifications
Consultant Qualifications Package
Contractor Prequalification
Design Build Bid Preparation
Design Build Bridge
Design Build Environmental
Design Build Inspection
Design Build Preliminary Engineering
Design Build Project
Design Build Project Execution
Design Build Review
How can a design-build team do peer review?
How do I purchase PENNDOT's Automated Tabulation (AutoTab) software?
What is the Owner's Perspective review?
What level of review is expected for the Peer Review (calculations or general review)?
Will partial submittals of the entire design plans be allowed for 1-Step, Low Bid projects?
Will the ability to use a Peer Reviewer be available as part of 1-Step, Low Bid projects?
Will the DM-4 Criteria for reviews (District vs. C.O.) be used for design-build reviews (Owner’s...
Design Build Right-of-Way
Design Build Team
Employee Roster
General
General Problems/Troubleshooting
Help Desk
IDM Viewer
List of Contractors
MBE and WBE
Miscellaneous
Price Proposal
Project Questions
Signature Authority
Statements of Interest
Technical Proposal