Frequently Asked Questions
Total Records: 191
Quick Find:
 
Lines Displayed:
 
Question
Addenda
Advertisements
Attachment
Bid Package
Bid Results
Bid Tabs
Bonds
Business Partner Registration
Consultant Inspection
Consultant Qualifications
Consultant Qualifications Package
Contractor Prequalification
Design Build Bid Preparation
Design Build Bridge
Design Build Environmental
Design Build Inspection
Design Build Preliminary Engineering
Does a request letter to use Design-Build, Low Bid still need to be sent to Central Office?
Is FHWA approval required for all design-build advertisements?
Often there is not enough geotechnical data available for consultants to provide an accurate bid...
What amount of conceptual MPT will be provided in Bid Package?
Where does utility coordination come in the schedule?
Will design exceptions be allowed as part of the design-build project?
Will electronic drawings be made available to the short listed Adjusted Bid Design-Build teams from...
Will the project schedule be provided by the Department prior to short listing?
Will the typical section of the bridge be fixed?
Design Build Project
Design Build Project Execution
Design Build Review
Design Build Right-of-Way
Design Build Team
Employee Roster
General
General Problems/Troubleshooting
Help Desk
IDM Viewer
List of Contractors
MBE and WBE
Miscellaneous
Price Proposal
Project Questions
Signature Authority
Statements of Interest
Technical Proposal