Frequently Asked Questions
Total Records: 191
Quick Find:
 
Lines Displayed:
 
Question
Addenda
Advertisements
Attachment
Bid Package
Bid Results
Bid Tabs
Bonds
Business Partner Registration
Consultant Inspection
Consultant Qualifications
Consultant Qualifications Package
Contractor Prequalification
Design Build Bid Preparation
Does a man-hour estimate need to be developed for the stipend?
Does the Department care who prepares the Technical Approach?
Does the Department still prepare a Scope-of Work in ECMS Wave 3 detailing the technical design to...
Does the design-build team submit a Technical Proposal?
How does meeting the design criteria impact a project?
How will teams know if the design-build selection process review will be “Firm Neutral”?
Is there a Question and Answer period between the Technical Approach due date and the bid proposal...
Programming of funds for design-build projects versus design-bid-build, will there be a difference?
The Agreement General Requirements limit the SOI length, is this length adequate for design-build...
What if the Alternate Technical Concept discussion results in a new design exception?
What part of the Technical Approach is made public?
When can questions be submitted in ECMS Wave 4; SOI?
Who can see ECMS questions?
Will the non-responsive bids be posted (the bid amount)?
Will there always be three short listed Design-Build Best Value teams?
Will there be different DBE goals for design and construction portion of the project or an overall...
Will Value Engineering be allowed during design-build projects?
Design Build Bridge
Design Build Environmental
Design Build Inspection
Design Build Preliminary Engineering
Design Build Project
Design Build Project Execution
Design Build Review
Design Build Right-of-Way
Design Build Team
Employee Roster
General
General Problems/Troubleshooting
Help Desk
IDM Viewer
List of Contractors
MBE and WBE
Miscellaneous
Price Proposal
Project Questions
Signature Authority
Statements of Interest
Technical Proposal