Frequently Asked Question
Design Build Bid Preparation
•
Question:
Will Value Engineering be allowed during design-build projects?
•
Answer:
Yes but it is limited to revisions in the information provided in the bid package. In addition, the team may submit an Alternate Technical Concept (ATC). It will be up to the Department to determine if the ATC is acceptable
Created by
Julius B Sanders/PennDOT
on
11/06/2008
at
12:43:23 PM