Design Build Bridge
•
Question:
For a historical bridge will all coordination and mitigation be done prior to letting?
•
Answer:
Yes. In order for the design-build team to accurately bid the historical project, the special provision associated with the bridge must indicate any special requirement associated with the bridge.