| Field Name |
State
|
Description |
| Project Header (Short) |
Display Only
|
The short project header provides identifying information about the project. |
| Percentage |
Display Only
|
The percentage of the contract for which the business partner is responsible. |
| Contract Awards Header |
Display Only
|
The Contract Awards header provides identifying information about the bidder and bid, as well as the type of project. This information includes the total Bid Amount. |
 |
 |
*****Prime Contractor/Joint Venture Partner*****
This section of the report is repeated for each prime contractor/joint venture partner. It shows the overall percentage of the bid amount represented by this business parnters' items, the bid amount for the individual business partner, as well as capacity and related information for the business partner. Beneath the primary joint venture partner's section, a subsection for subcontractors is displayed. |
| Percentage |
Display
|
The percentage of the bid amount represented by items assigned to this prime contractor. If the apparent low bidder is a joint venture, the percentage for each prime contractor is calculated separately. |
| Bid Total |
Display Only
|
The total amount of the bid submitted by the business partner. When the report is generated for a joint venture partnership, the Bid Total in each section represents the value of the items that have been bid by the individual business partner. |
| Maximum Capacity |
Display Only
|
The maximum capacity of the contractor for which the report is being run and at the time the report is run. |
| Available Capacity |
Display Only
|
The available capacity of the contractor for which the report is being run and at the time the report is being run.
The available capacity of the contractor must be greater than the bid amount for the contractor to pass the financial capacity check on the Contract Awards Checklist. If the available capacity is within ten percent of the maximum capacity, the "Within 10% of Maximum" field is displayed as Yes.
Note: Because this is a real-time report, the Available Capacity may change from one run of the report to the next, for example, if the contractor receives an estimated payment.
|
| Within 10% of Maximum |
Display Only
|
If this field displays "Yes", the current available capacity is within 10% of the maximum capacity allowed for the contractor. |
| Outstanding Bids |
Display Only
|
This field displays a list of projects for which the contractor currently has outstanding bids (that is, the bids for the project have been opened and the contractor is the apparent low bidder, but the contract has not yet been awarded).
This field provides a hyperlink to the Bid Results screen for the specified project number and let date.
|
| General Highway Contractor |
Display Only
|
This field indicates whether the business partner to whom the report section applies is a General Highway Contractor. |
| Item Number |
Display Only
|
The item number that was part of the prime contractor's bid. |
| Work Class Code |
Display Only
|
Displays the work class codes assigned to the item. |
| Item Total |
Display Only
|
Total dollar amount bid for the item as calculated by multiplying the quantity by the unit price contained in the contractor's bid. |
| Qualified Amount |
Display Only
|
If the contractor is qualified for the item, this field will hold the item total; otherwise, it displays zeroes. |
| Y Code Descriptions |
Display Only
|
This field displays the description added with the Y Code work class code. |
| Work Class |
Display Only
|
This label describes the work class code identified for the item as it relates to the contractor. The labels are defined below:
Qualified - The total and percentage are listed for items for which the contractor is prequalified.
Not Qualified - The total and percentage are listed for items for which the contractor is not prequalified.
Z Items - The total and percentage are listed for items that have a Z work class code assigned.
X Items - The total and percentage are listed for items that have an X work class code assigned.
ZZ Items - The total and percentage are listed for items that have a ZZ work class code assigned.
Total Qualified - The total and percentage are listed for all Qualified Items listed plus all Z Items Listed.
Unidentified - The total and percentage are listed for all items that did not fall into any of the above categories.
|
| Total |
Display Only
|
The sum of the item price (quantity times unit price) for all of the items belonging to the corresponding category. For example, in the Qualified row, this is the sum of the item prices for all of the work class codes in the project for which the contractor is qualified. |
| Percentage |
Display Only
|
The percentage of the bid represented by this category of items. Calculated as Total for the category divided by Total for all items (less the X items and ZZ items.)
This field is not displayed for X items and ZZ items.
|
 |
 |
*****Subcontractor Items Section*****
|
| Subcontractor |
Display Only
|
The name of the subcontractor that was listed in the contractor bid. This will be repeated for each subcontractor. If the user expands the subcontractor section (by clicking the blue twistie), the display is refreshed to show the item/qualification details for the subcontractor. |
| Amt Subcontracted |
Display Only
|
This unlabeled field to the right of the Subcontractor name shows the dollar amount subcontracted to this business partner. |
| Subcontractor Item Details |
Display Only
|
The item qualification details for the subcontractor use the same fields and calculations shown for the prime contractor. |