Frequently Asked Question

Design Build Environmental Question:
Obtaining JPA Permits can take a long time. Is there a consideration during scoping as to whether this particular project may take longer?

Answer:
It will be the responsibility of the scoping teams to consider the length of time that will be involved in obtaining the JPA permits and then make a determination whether design-build makes sense for the project.